Author:
Yu Wei,Ma Yu-min,Qiao Fei
Publisher
Springer Berlin Heidelberg
Reference15 articles.
1. Bankston JB, Harnett RM (2000) A heuristic algorithm for a multi-product, single machine capacitated production scheduling problem. Comput Oper Res 27:77–92
2. Bao Z, Wang W, Peng W, Pan Q (2012) Research on Production Scheduling System with Bottleneck Based on Multi-agent. In: 2012 international conference on applied physics and industrial engineering, Physics Procedia, pp 1903–1909
3. Chan W-T, Hao H (2001) An application of genetic algorithms to precast production scheduling. Comput Struct 79:1605–1616
4. Chang J, Gong D, Ma X (2007) A heuristic genetic algorithm for no-wait flowshop scheduling problem. J China Univ Min Technol 17(4):0582–0586
5. Drobouchevitch IG, Strusevich VA (2001) Two-stage open shop scheduling with a bottleneck machine. Eur J Oper Res 128:159–174