Author:
Sauer Jürgen,Chua Tay Jin
Publisher
Springer Berlin Heidelberg
Reference22 articles.
1. Chua, T.J., et al.: Integrated Production Planning, Scheduling and Shop Floor Tracking system for High-Mix Low-Volume Manufacturing - A Consortium Approach. In: Key Engineering Materials, vol. 447-448, pp. 306–310. Transtech Publications (2010)
2. Dorn, J., Kerr, R.M., Thalhammer: Reactive Scheduling – improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning. International Journal on Human-Computer Studies 42, 687–704 (1995)
3. Dorn, J.: Evaluating reactive scheduling systems. In: Proceedings of the IEEE/WIC/ACM International Conference on Intelligent Agent Technology (IAT 2004). IEEE, New York (2004)
4. Dubois, D., Prade, H.: The three semantics for fuzzy sets. Fuzzy Sets and Systems 90(2), 141–150 (1997)
5. Dubois, D., Fargier, H., Fortemps, P.: Fuzzy Scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operations Research 147, 231–252 (2003)