Publisher
Springer Berlin Heidelberg
Reference24 articles.
1. Anderson, D.R. and Moodie, C.L. (1969). Optimal buffer storage capacity in production line systems. International Journal of Production Research, 7, 233–240.
2. Baker, K.R., Powell, S.G. and Pyke, D.F. (1994). A predictive model for the throughput of unbalanced, unbuffered three-station serial lines. IIE Transactions, 26, 62–71
3. Barten, K. (1962). A queueing simulator for determining optimum levels in a sequential process. The Journal of Industrial Engineering, 13, 245–252
4. Cheng, R.C.H. and Jones, G. (1982). An automatic method for modelling and analysing industrial chemical plants. European Journal of Operational Research, 14, 79–88.
5. Cherry, D.H. (1976). Blocking-an interactive technique for the calculation of chemical plant availability. ICI Report No. CL-R/76/1108/A.