Publisher
Springer Berlin Heidelberg
Reference15 articles.
1. Al-Tahat MD, Dalalah D, Barghash MA (2009) Dynamic programming model for multi-stage single-product Kanban-controlled serial production line. J Intell Manuf 23:37–48
2. Araz ÖU, Eski Ö, Araz C (2006) A multi-criteria decision making procedure based on neural networks for Kanban allocation. Springer, Berlin, pp 898–905
3. Colombo AW, Carelli R, Kuchen B (1997) A temporised Petri net approach for design, modelling and analysis of flexible production systems. Adv Manuf Technol 13:214–226
4. Di Mascolo M, Frein Y, Dallery Y, David R (1991) A unified modeling of Kanban systems using Petri nets. Int J Flexible Manuf Syst 3:275–307
5. Du X (2010) Development of flexible manufacturing system (FMS). Sci Technol Assoc Forum 5:35 (In Chinese)