1. Abele E, Kulok M, Tschannerl M (2006) Rationalisierungspotential erkennen und umsetzen, Tagungsband 3 3rd HSC/HPC-Praktikerseminar “HSC/HPC-Praktikerseminar: Die Bohrarbeitung im Produktionsprozeß” [How to Recognize and Realize Improvements in Productivity. 3rd HSC- and HPC-Seminar for Practit ioners: The Drilling Operation as Part of the Manufacturing Process.], Darmstadt, 25.10.2006. (in German)
2. Heinemann R (2004) Improving the performance of small diameter twist drills in deep-hole drilling. PhD thesis, University of Manchester Institute of Science and Technology
3. Heinemann RK (2012) The effect of starting hole geometry on borehole quality and tool life of twist drills. International journal of advanced manufacturing technology 60(5–8):519–526. doi:10.1007/s00170-011-3625-7
4. Hoshi T, Hosoi T (1989) High performance drill geometry (Part I). Metalworking engineering and marketing 11(3):46–51
5. Hoshi T, Zhao H, Hosoi T (1989) Study of high performance drill geometry. CIRP-Ann – Manuf Technol 38(1):87–90