1. Abbink E, Fischetti M, Kroon L, Timmer G, Vromans M (2005) Reinventing crew scheduling at Netherlands railways. Interfaces 35(5):393–401
2. Abbink E, Mobach D, Fioole P, Kroon L, Wijngaards N, Van der Heijden E (2009) Actor-agent application for train driver rescheduling. In: Proceedings of 8th international conference on autonomous agents and multiagent systems (AAMAS 2009)
3. Alfieri A, Groot R, Kroon L, Schrijver A (2006) Efficient circulation of railway rolling stock. Transp Sci 40:378–391
4. Brons M (2006) Beleving en waardering van betrouwbaarheid in de ov-keten: een conceptueel kader. Technical report, Free University Amsterdam, TRANSUMO
5. Budai G, Maróti G, Dekker R, Huisman D, Kroon L (2010) Balancing of railway rolling stock during track maintenance. J Sched 13:281–297