1. ADAMS, J., Balas, E. and Zazwack. D., 1988, The Shifting Bottleneck Procedure for Job Shop Scheduling, Management Science, 34(3), pp. 391–401.
2. BALAS, E., 1968, Project Scheduling with Resource Constraints, Proc. of the NATO Conference in Applications of Mathematical Programming, Cambridge, England, pp. 24–28.
3. BEAN, J. and J. Birge, “Match-Up Real-Time Scheduling,” Proceeding of a Symposium on Real-Time Optimization in Automated Manufacturing Facilities, NBS Publication 724, National Bureau of Standards, 1986, pp. 197–212.
4. BEAN, J.C., J.R. Birge, J. Mittenthal and C.E. Noon, 1991, Matchup Scheduling With Multiple Resources, Release Dates and Disruptions, Operations Research, 39(3), pp. 470–483.
5. BIRGE, J.R., 1985, Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs, Operations Research, 33(5), pp. 989–1007.