Author:
Iwanowski Daniel,Janiak Adam,Rogala Adrian
Publisher
Springer Berlin Heidelberg
Reference6 articles.
1. Alidaee B.: A heuristic solution procedure to minimize makespan with non-linear cost functions, Journal of the Operations Research Society, Vol. 41/11, 1990, pp. 1065–1068.
2. Alidaee B., Landram F.: Scheduling deteriorating jobs on a single machine to minimize the maximum processing times, International Journal of System Science, Vol. 27, No. 5, 1995, pp. 507–510.
3. Bachman A.: Single machine scheduling problems for the jobs with start time dependent processing times (PhD Dissertation), Institute of Engineering Cybernetics, Wroclaw University of Technology, Wroclaw 1999 (in Polish).
4. Daniels L. R.: Resource allocation and multi-project scheduling in: Advances in Project Scheduling, Slowinski R., Wȩglarz J. (eds.) Elsevier Sci. Publish., 1989.
5. Ho K. I-J., Leung J. Y-T., Wei W-D.: Complexity of scheduling tasks with time-dependent execution times, Information Processing Letters, Vol. 48, 1993, pp. 315–320.