1. Afentakis, P. (1986), Maximum throughput in flexible manufacturing systems, in K.E. Stecke, R. Suri (eds.), Proc. 2nd ORSA/TIMS Conf. on FMS, Elsevier, Amsterdam, 509–520.
2. Akella, R., Choong, Y., Gershwin, S.B. (1984), Performance of a hierarchical production scheduling policy, IEEE Trans. Comp. Hybrids and Manufac. Tech. 7, 225–240.
3. Akella, R., Choong, Y., Gershwin, S.B. (1985), Real-time production scheduling of an automated cardline, Ann. Oper. Res. 3, 403–425.
4. Akella, R., Bevans, J.P., Choong, Y. (1985a), Simulation of a flexible manufacturing system, LIDS-P-1435, Cambridge.
5. Baku, K., Meyer, E. (1982), Wirtschaftliche Fertigungsorganisation für Automobilzulieferer, ZwF 77, 273–276.