Author:
Xu Feng,Song Yuanbin,Hu Hao
Publisher
Springer Berlin Heidelberg
Reference17 articles.
1. Akinci, B., Fischen, M.: Four-dimensional Workplanner—A Prototype System for Automated Generation of Construction Spaces and Analysis of Time-space Conflicts. In: Fruchter, R., et al. (eds.) Computing in Civil and Building Engineering, pp. 740–747. ASCE, Reston (2000)
2. Akinci, B., Fischen, M., Levitt, R., et al.: Formalization and Automation of Time-Space Conflict Analysis. Journal of Computing in Civil Engineering 16(2), 124–134 (2002)
3. Halpin, D.W.: CYCLONE-method for Modeling Job Site Processes. Journal of Construction Division, ASCE 103(3), 489–499 (1977)
4. Halpin, D.W.: MicroCYCLONE User’s Manual. West Lafayette, Division of Construction Engineering and Management, Purdue University, Indiana (1990)
5. Howell, G., Ballard, G.: Factors Affecting Project Success in the Piping Function. In: Alarcon, L. (ed.) Lean Construction, Rotterdam, The Netherlands, pp. 161–185 (1997)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献