Author:
Jain Sandeep,Raghavan N. R. Srinivasa
Publisher
Springer Berlin Heidelberg
Reference9 articles.
1. John Wiley and Sons Inc.;MM Philip,1958
2. Buzacott, J. A. and Shanthikumar, J. G. (1993) Stochastic Models of Manufacturing Systems. Prentice Hall, New Jersey
3. New age International Ltd. Publishers;SS Rao,1998
4. Kim, Illyung and S. Tang, Christopher(1997) Lead time and response time in a pull production control system. European Journal of Operational Research. 101, 474–485
5. Bertsimas, D. and Ch. Paschalidis, Ioannis(2001) Probabilistic service level guarantees in make-to-stock manufacturing systems. Opers, Res. 49, 0119–0133
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献