Publisher
Springer Science and Business Media LLC
Subject
Geotechnical Engineering and Engineering Geology,Civil and Structural Engineering
Reference48 articles.
1. Anagnostopoulos KP, Kotsikas L (2010) Experimental evaluation of simulated annealing algorithms for the time–cost trade-off problem. Appl Math Comput 217(1):260–270. https://doi.org/10.1016/j.amc.2010.05.056
2. Ashofteh PS, Bozorg-Haddad O (2019) Environmental impact assessment of irrigation network implementation on triple environments. J Civ Environ Eng (university of Tabriz) 48(93):91–101
3. Ballesteros-Perez P, Elamrousy KM, González-Cruz MC (2019) Non-linear time-cost trade-off models of activity crashing: application to construction scheduling and project compression with fast-tracking. Autom Constr 97:229–240. https://doi.org/10.1016/j.autcon.2018.11.001
4. Banihashemi SA, Khalilzadeh M (2018) Sensitivity analysis for estimating cost of project execution with EVM technique by considering factors of quality and risk. Iran J Trade Stud 22(87):187–214
5. Barzehkar M, Kargari N, Mobarghaee Dinan N (2016) Investigation and comparison capabilities of common methods of environmental impact assessment and ELECTRE-TRI multi-criteria decision method. J Hum Environ 14(1):43–54
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献