1. Kitazume M, Terashi M (2013) The deep mixing method. CRC Press
2. Martel DW, Piling W (2015) Dam wall toe stabilisation using mass soil mixing techniques. In: Deep mixing 2015, pp 181–192
3. Shrestha R, Jose S, Griffin R, Jose S, Cali P, Engineering SL, Kafle S, Jose S, Watanabe M, Jose S, Yang D, Jose S (2015) Deep mixing for levee repair at hurricane protection project. In: Deep Mixing 2015, vol 23, pp 257–266
4. Bertoni M, Schmutzler W (2015) Soil mixing for the LPV-111 levee improvement, New Orleans: a case history. In: Deep mixing 2015, vol 2, pp 247–256
5. Arnold M (2015) Seepage cut-off wall installation using cutter soil mixing for Herbert Hoover dike rehabilitation. In: Deep mixing 2015, vol 727, pp 213–222