1. BAKHTAVAR E, SHAHRIAR K, ORAEE K. Mining method selection and optimization of transition from open pit to underground in combined mining [J]. Archives of Mining Sciences. 2009, 54: 481–493.
2. HAN X M, LI Z J, GAN D Q. Numerical simulation and sensitivity analysis of slope stability in mine transferred from open pit to underground mining [J]. Metal Mine, 2007(6): 8–12. (in Chinese)
3. SONG W D, WANG Z C, GONG D F. Numerical simulation on the slope stability when transferring open-pit mining to underground mining in Zimudang gold mine [J]. Gold, 2008, 29: 20–23.
4. SAFARI M, ATAEI M, KHALOKAKAIE R, KARAMOZIAN M. Mineral processing plant location using the analytic hierarchy process–A case study: The Sangan iron ore mine [J]. Mining Science and Technology, 2010, 20: 0691–0695.
5. SUN S G, GUO W C, LIU W B, GUO P, DONG Y F. Study on high slope sliding deformation mechanism induced by transiting from opencast into underground mining [J]. Metal Mine, 2015, 15(5): 162–165. (in Chinese)