Author:
Chakraborty Sanjib,Roy Indranil,Kumar Suresh
Publisher
Springer Science and Business Media LLC
Reference33 articles.
1. Batelaan O, De Smedt F. (2007) GIS-based recharge estimation by coupling surface-subsurface water balances. Jour. Hydrol., v.337(3), pp.337–355.
2. Bouwer, H. (1978) Groundwater Hydrology. Mc-Graw Hill, 480p.
3. Census (2001) Population census of India; Ministry of Home affairs; https://censusindia.gov.in/post_enumeration/post_enumaration.html
4. CGWB (1997) Ground Water Resource Estimation Methodology, 1997, CGWB, Min of Water Resources, Govt. of India
5. Chen, J.F., Lee, C.H., Yeh, T.C.J., Yu, J.L. (2005) A water budget model for the Yun-Lin plain, Taiwan. Water Resour. Managmt., v. 19(5), pp.483–504.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献