1. AGHAJANI, A. and OSANLOO, M. (2007) Application of AHP–TOPSIS Method for Loading–Haulage quipment Selection in Open pit Mines. Jour. XXVII Internat.l Mining Convention. Mexico, pp.12–16.
2. AGHAJANI, A. and GOLESTANIFAR, M. (2010) A decision framework for tailing impoundment site selection, Jour. Environ. Earth Sci., v.61(7). pp.1505–1513.
3. AGUSTAWIJAYA, D.S. (2005) The influence of rock engineering properties on slope stability at Senggigi resort area, Lombok island. Jour. TeknikSipil, v.6(1), pp.92–97.
4. AKKOC, S. and VATANSEVER, K. (2013) Fuzzy Performance Evaluation with AHP and Topsis Methods: Evidence from Turkish Banking Sector after the Global Financial Crisis. Eurasian Jour. Business and Economics, v.6(11), pp.53–74.
5. BALL, S. and KORUKOGLU, S. (2009) Operating system selection using fuzzy AHP and TOPSIS methods, Mathematical and Computational Applications, v.14(2), pp.119–130.