Author:
Cai Xiaoqiang,Wu Xianyi,Zhou Xian
Reference36 articles.
1. Adiri, I., Bruno, J., Frostig, E., & Rinnooy Kan, A. H. G. (1989). Single machine flowtime scheduling with a single breakdown. Acta Informatica, 26, 679–696.
2. Adiri, I., Frostig, E., & Rinnooy Kan, A. H. G. (1991). Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs. Naval Research Logistics, 38, 261–271.
3. Ball, M., Barnhart, C., Nemhauser, G., & Odoni, A. (2007). Air transportation: Irregular operations and control. In C. Barnhart & G. Laporte (Eds.), Handbooks in operations research and management science Vol. 14 – Transportation (pp. 1–68). Amsterdam: Elsevier.
4. Birge, J., Frenk, J. B. G., Mittenthal, J., & Rinnooy Kan, A. H. G. (1990). Single-machine scheduling subject to stochastic breakdown. Naval Research Logistics, 37, 661–677.
5. Cai, X.Q.i, & Zhou, X. (1999). Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost. Operations Research, 47, 422–437.