Author:
Cai Xiaoqiang,Wu Xianyi,Zhou Xian
Reference10 articles.
1. Bast, H. (1998). Dynamic scheduling with incomplete information. Proceedings of the tenth annual ACM symposium on parallel algorithms and architectures, Puerto Vallarta (pp. 182–191).
2. Chen, C. Y. I., George, E. I., & Tardif, V. (2001). A Bayesian model of cycle time prediction. IIE Transactions, 33(10), 921–930.
3. Gage, A., & Murphy, R. R. (2004). Sensor scheduling in mobile robots using incomplete information via Min-Conflict with Happiness. IEEE Transactions on Systems, Man, and Cybernetics, Part B, 34, 454–467.
4. Gardoni, P., Reinschmidt, K. F., & Kumar, R. (2007). A probabilistic framework for Bayesian adaptive forecasting of project progress. Computer-Aided Civil and Infrastructure Engineering, 22, 182–196.
5. Gittins, J. C. (1989). Multi-armed bandit allocation indices (Wiley-Interscience series in systems and optimization). Chichester: Wiley. ISBN:0-471-92059-2.