Author:
Cai Xiaoqiang,Wu Xianyi,Zhou Xian
Reference23 articles.
1. Baker, K. R., & Scudder, G. D. (1990). Sequencing with earliness and tardiness penalties: A review. Operations Research, 38, 22–36.
2. Benmansour, R., Allaoui, H., & Artiba, A. (2012). Stochastic single machine scheduling with random common due date. International Journal of Production Research, 50, 3560–3571.
3. Boxma, O. J., & Forst, F. G. (1986). Minimizing the expected weighted number of tardy jobs in stochastic flow shops. Operations Research Letters, 5, 119–126.
4. Buzacott, J. A., & Shanthikumar, J. G. (1993). Stochastic models of manufacturing systems. Englewood Cliffs: Prentice Hall.
5. Cai, X.Q.i, & Zhou, X. (1997b). Scheduling jobs with random processing times to minimize weighted completion time variance. Annals of Operations Research, 70, 241–260.