1. Jiangbo L, Xiaopei B, Xiaoming W et al (2014) Snubbing string of separate layer water injection in Changqing oilfield. Fault-Block Oil Gas F 21(02):259–261
2. Jiewen S, Fanfei J, Ruoyu Y et al (2019) Application of gas lift process with coiled tubing in low-pressure deep wells. Sci Technol Eng 19(05):124–128
3. Shengguang T, Li Z, Xiaoping Z et al (2014) Safety monitoring system design of SJDBY160K snubbing equipment. China Pet Mach 42(06):105–108
4. Bin C, Yong P, Wenhui Y et al (2008) Analysis of development situation of the subbing workover equipment. Drill Prod Technol 31(06):106–109
5. Dawei Y, Xinlong C, Wei W et al (2017) Development and application of novel stand-alone snubbing unit. China Pet Mach 45(05):103–106