1. Aanen, E., Planning and scheduling in a flexible manufacturing system, PhD thesis, Faculty of Mechanical Engineering, University of Twente, Enschede, the Netherlands, 1988.
2. Balas, E., Lenstra, J. K., and Vazacopoulos, A., ?The One Machine Problem with Delayed Precedence Constraints and its use in Job Shop Scheduling?, Management Science, Vol. 41, No. 1, 1995, pp. 94?109.
3. Dell'Amico, M., ?Shop Problems with Two Machines and Time Lags?, Internal Report No.93/20, Department of Electronics and Information, Milan Polytechnic, Milan, Italy, 1993.
4. Graham, R. L., Lawler, E. L., Lenstra, J. K., and Rinnooy Kan, A. H. G., ?Optimization and approximation in deterministic sequencing and scheduling: A survey,? Annals of Discrete Mathematics, Vol. 5, 1979, pp. 287?326.
5. Johnson, S. M., ?Optimal two and three stage production schedules with setup times included,? Naval Research Logistics Quarterly, Vol. 1, No. 1, 1954, pp. 61?68.