1. ACE (1998).William Creek basin 18 sanitary sewer evaluation survey report for the City of Indianapolis. American Consulting Engineers, Inc., Indianapolis, IN.
2. ADS (2000).City of Indianapolis wet weather report January–December 1999. ADS Environmental Services Inc., Indianapolis, IN.
3. Arditi, D.A. and Messiha, M.H. (1996). “Life-cycle costing in municipal construction projects.”Journal of Infrastructure Systems, ASCE, Vol. 1, No. 1, pp. 33–43.
4. ASCE (2003).2003 Progress Report for America's Infrastructure. Available from http://www.asce.org/reportcard.
5. ASCE (1982).Gravity sanitary sewer design and construction. Manuals and reports 60, ASCE and Water Pollution Control Federation, New York, NY.