Author:
Tian Yunna,Li Dongni,Zhou Pengyu,Guo Rongtao,Liu Zhaohe
Funder
National Natural Science Foundation of China
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Industrial and Manufacturing Engineering,Software
Reference30 articles.
1. Babu, S. A. K. I., Pratap, S., Lahoti, G., Fernandes, K. J., Tiwari, M. K., Mount, M., et al. (2014). Minimizing delay of ships in bulk terminals by simultaneous ship scheduling, stockyard planning and train scheduling. Maritime Economics and Logistics, 17(4), 464–492.
2. Barman, S. (1997). Simple priority rule combinations: An approach to improve both flow time and tardiness. International Journal of Production Research, 35(10), 2857–2870.
3. Burke, E. K., Gendreau, M., Hyde, M., Kendall, G., Ochoa, G., Özcan, E., et al. (2013). Hyper-heuristics: A survey of the state of the art. Journal of the Operational Research Society, 64(12), 1695–1724.
4. Carroll, D. C. (1965). Heuristic sequencing of jobs with single and multiple components. Cambridge, MA: Sloan School of Management, Massachusetts Institute of Technology.
5. Cowling, P., Kendall, G., & Soubeiga, E. (2001). A hyperheuristic approach to scheduling a sales summit. In E. Burke & W. Erben (Eds.), Practice and theory of automated timetabling III. LNCS (Vol. 2079, pp. 176–190). Berlin: Springer.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献