Abstract
AbstractResearch on scheduling problems is an evergreen challenge for industrial engineers. The growth of digital technologies opens the possibility to collect and analyze great amount of field data in real-time, representing a precious opportunity for an improved scheduling activity. Thus, scheduling under uncertain scenarios may benefit from the possibility to grasp the current operating conditions of the industrial equipment in real-time and take them into account when elaborating the best production schedules. To this end, the article proposes a proof-of-concept of a simheuristics framework for robust scheduling applied to a Flow Shop Scheduling Problem. The framework is composed of genetic algorithms for schedule optimization and discrete event simulation and is synchronized with the field through a Digital Twin (DT) that employs an Equipment Prognostics and Health Management (EPHM) module. The contribution of the EPHM module inside the DT-based framework is the real time computation of the failure probability of the equipment, with data-driven statistical models that take sensor data from the field as input. The viability of the framework is demonstrated in a flow shop application in a laboratory environment.
Funder
Ministero dell’Istruzione, dell’Università e della Ricerca
Politecnico di Milano
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Industrial and Manufacturing Engineering,Software
Reference75 articles.
1. Abedinnia, H., Glock, C. H., Grosse, E. H., & Schneider, M. (2017). Machine scheduling problems in production: A tertiary study. Computers & Industrial Engineering, 111, 403–416. https://doi.org/10.1016/j.cie.2017.06.026.
2. Allahverdi, A., Aydilek, H., & Aydilek, A. (2018). No-wait flowshop scheduling problem with two criteria; total tardiness and makespan. European Journal of Operational Research, 269(2), 590–601. https://doi.org/10.1016/j.ejor.2017.11.070.
3. Aramon Bajestani, M., & Beck, J. C. (2015). A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines. Journal of Scheduling, 18(5), 471–486. https://doi.org/10.1007/s10951-015-0416-2.
4. Bagheri, A., Zandieh, M., Mahdavi, I., & Yazdani, M. (2010). An artificial immune algorithm for the flexible job-shop scheduling problem. Future Generation Computer Systems, 26(4), 533–541. https://doi.org/10.1016/j.future.2009.10.004.
5. Baheti, R., & Gill, H. (2011). Cyber-physical Systems. In T. Samad & A. Annaswamy (Eds.), The Impact of Control Technology (Issue 12, pp. 161–166). IEEE Control Systems Society.
Cited by
96 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献