1. Barlas, Y., & Diker, G. V. (1996). An interactive dynamic simulation model of a university management system. 1996 ACM 0-89791-820-7.
2. Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S., & Xiao, G. (2006a). Short-term system bottleneck identification. In Proceedings of The 7th international conference on frontiers of design and manufacturing, June 19–22, 2006, Guangzhou, China, pp. 203–208.
3. Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S., & Xiao, G. (2006b). Maintenance opportunity planning system. In Proceedings of 2006 international symposium on flexible automation, July 10–12, 2006, Osaka, Japan, pp. 244–251.
4. Klungle, R. (1999). Simulation of a claims call center: A success and a failure. In P. A. Farrington, H. B. Nembhard, D. T. Sturrock, & G. W. Evans (Eds.), Proceedings of the 1999 winter simulation conference.
5. Parker, R. S., & Marriott, A. J. (1999). “Personnel forecasting strategic workforce planning’ A proposed simulation cost modeling methodology. In P. A. Farrington, H. B. Nembhard, D. T. Sturrock, & G. W. Evans (Eds.), Proceedings of the 1999 winter simulation conference.