Author:
Behnamian J.,Fatemi Ghomi S. M. T.
Publisher
Springer Science and Business Media LLC
Subject
Artificial Intelligence,Industrial and Manufacturing Engineering,Software
Reference110 articles.
1. Adzakpa, K. P., Adjallah, K. H., & Yalaoui, F. (2004). On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization. Journal of Intelligent Manufacturing, 15(2), 131–140.
2. Agarwal, R., De, P., & Wells, C. E. (1995). Cooperative distributed problem solving: An investigation in the domain of job shop scheduling. In Proceedings of the 28th annual Hawaii international conference on system sciences, Kihei, Hawaii.
3. Ahmed, M. U., & Sundararaghavan, P. S. (1990). Minimizing the weighted sum of late and early completion penalties in a single machine. IIE Transactions, 22(3), 288–290.
4. Aissani, N., Bekrar, A., Trentesaux, D., & Beldjilali, B. (2012). Dynamic scheduling for multi-site companies: A decisional approach based on reinforcement multi-agent learning. Journal of Intelligent Manufacturing, 23(6), 2513–2529.
5. Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2008). A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985–1032.
Cited by
119 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献