The proper trade-off between various project costs is often disregarded when planning projects. This leads to several detrimental effects, such as inaccurate planning and higher total cost, far more significant in a multi-project environment. To overcome this limitation, this study proposes a combined approach for the multi-project scheduling and material ordering problem (MPSMOP), which maintains the proper trade-off among various costs. Moreover, the environmental impact and project quality objectives are optimized alongside the economic criterion. The proposed methodology involves three stages: (a) quantifying the environmental performance of suppliers; (b) measuring the activities’ quality through the Construction Quality Assessment System approach; and (c) building and solving the mathematical model of the MPSMOP. The MPSMOP is modeled as a tri-objective optimization approach aiming to determine project scheduling and material ordering decisions so that the net present value, environmental score, and total quality of implemented projects are maximized simultaneously. As the proposed model comes into the nondeterministic polynomial optimization problem category, two powerful metaheuristics are customized and used to solve the problem. The efficiency of both algorithms was assessed on several datasets. The proposed framework is applied to railway construction projects in Iran as a case study, which presents the validity of the model and the decision-making options provided to managers.
Funder
University of New South Wales
Publisher
Springer Science and Business Media LLC
Subject
Health, Toxicology and Mutagenesis,Pollution,Environmental Chemistry,General Medicine
Reference73 articles.
1. Akhbari M (2022) Integration of multi-mode resource-constrained project scheduling under bonus-penalty policies with material ordering under quantity discount scheme for minimizing project cost. Scientia Iranica 29(1):427–446
2. Al-Jebouri MF, Saleh MS, Raman SN, Rahmat RAABO, Shaaban AK (2017) Toward a national sustainable building assessment system in Oman: assessment categories and their performance indicators. Sustain Cities Soc 31:122–135
3. Aquilano NJ, Smith DE (1980) A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning. J Oper Manag 1(2):57–67
4. Asadujjaman M, Rahman HF, Chakrabortty RK, Ryan MJ (2021) A memetic algorithm for concurrent project scheduling, materials ordering and suppliers selection problem. Procedia Comput Sci 192:717–726
5. Balusa BC, Gorai AK (2019) Sensitivity analysis of fuzzy-analytic hierarchical process (FAHP) decision-making model in selection of underground metal mining method. J Sustain Min 18(1):8–17
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献