1. Armanini A, Larcher M (2001) Rational criterion for designing opening of slit-check dam. Journal of Hydraulic. Engineering 127(2): 94–104. DOI: 10.1061/(ASCE)0733-9429(2001)127: 2(94).
2. Canelli L, Ferrero AM, Migliazza M, et al. (2012) Debris flow risk mitigation by the means of rigid and flexible barriers–experimental tests and impact analysis. Natural Hazards and Earth System. Sciences 12: 1693–1699. DOI: 10.5194/nhess-12-1693-2012.
3. Chen H, Dadson S, Chi Y (2006) Recent rainfall–induced landslides and debris flows in northern Taiwan.. Geomorphology 77: 112–125. DOI: 10.1016/j.geomorph.2006. 01.002.
4. Chen JG, Chen XQ, Wang T, Marchi, L, Cavalli, M et al. (2014a) Types and causes of debris flow damage to drainage channels in the Wenchuan earthquake area. Journal of Mountain. Science 11(6): 1406–1419. DOI: 10.1007/s11629-014-3045-x.
5. Chen XQ, Cui P, You Y, et al. (2015) Engineering measures for debris flow hazard mitigation in the Wenchuan earthquake area. Engineering. Geology 194: 73–85. DOI: 10.1016/j.enggeo. 2014.10.002