Funder
National Natural Science Foundation of China
Natural Science Foundation of Hunan Province
Excellent Youth Project of Science Research of Hunan Provincial Education Department
Open Project of Xiangjiang Laboratory
Publisher
Springer Science and Business Media LLC
Reference24 articles.
1. Artiba A, Tahon C (1992) Production planning knowledge-based system for pharmaceutical manufacturing lines. Eur J Oper Res 61(1–2):18–29
2. Blazewicz J, Ecker KH, Schmidt G, Weglarz J (2012) Scheduling in computer and manufacturing systems. Springer, Berlin
3. Chen J, Huang M, Guo Y (2022) Scheduling multiple two-stage fowshops with a deadline. Theor Comput Sci 921:100–111
4. Dong J, Tong W, Luo T, Wang X, Hu J, Xu Y, Lin G (2017a) An FPTAS for the parallel two-stage flowshop problem. Theor Comput Sci 657:64–72
5. Dong J, Hu J, Kovalyov M, Lin G, Luo T, Tong W, Wang X, Xu Y (2017b) Corrigendum to An FPTAS for the parallel two-stage flowshop problem. Theor Comput Sci 687:93–94