Publisher
Springer Science and Business Media LLC
Subject
Applied Mathematics,Computational Theory and Mathematics,Control and Optimization,Discrete Mathematics and Combinatorics,Computer Science Applications
Reference34 articles.
1. Adiri I, Pohoryles D (1982) Flowshop/no-idle or no-wait scheduling to Minimize the sum of completion times. Naval Res Logist Quart 29(3):495–504
2. Agnetis A, Billaut JC, Gawiejnowicz S, Pacciarelli D, Soukhal A (2014) Multiagent scheduling. doi 10, no 1007,p 978-3, Springer, Berlin
3. Agnetis A, Mirchandani PB, Pacciarelli D, Pacifici A (2004) Scheduling problems with two competing agents. Oper Res 52(2):229–242
4. Ahmadi-Darani M, Moslehi G, Reisi-Nafchi M (2018) A two-agent scheduling problem in a two-machine flowshop. Int J Ind Eng Comput 9(3):289–306
5. Allahverdi A (2016) A survey of scheduling problems with no-wait in process. Eur J Oper Res 255(3):665–686
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献