1. Bai JB, Wang WJ, Hou CJ, Huang HF (2000) Control mechanism and support technique about gateway driven along goaf in fully mechanized top coal caving face. J China Coal Soc 25(5):478–481
2. Bai JB, Zhou HQ, Hou CJ, Tu XZ, Yue DZ (2004) Development of support technology beside roadway in goaf-side entry retaining for next sublevel. J China Univ Min Technol 33(2):183–186
3. Chen YG, Qian MG (1994) Surrounding rock control of Chinese coal mining stope. China University of Mining & Technology Press, Xuzhou
4. Hou CJ, Ma NJ (1989) Stress in in-seam roadway sides and limit equilibrium zone. J China Coal Soc 14(4):21–29
5. Huang YL, Zhang JX, Zhang Q, Zan DF (2011) Technology of gob-side entry retaining on its original position in fully-mechanized coalface with solid material backfilling. J China Coal Soc 10(36):1624–1628