1. Mamaqani B, Najafi M (2015) Arching effects in box jacking projects. Pipelines 2015:145–153
2. Sun J, Yu X, Sun M, Li X (2006) Analysis and prediction on soft ground deformation of a super-large shallow burried’pipe-roofing and box-culvert’ jacking project under construction. Yantu Lixue (Rock Soil Mech) 27(7):1021–1027
3. Xia C, Gong J, Chen Y, Jiang K (2008) Analysis of ground settlements of over-length pile and box culvert advancing under airport taxiway. Chin J Rock Mech Eng 27(4):696–703
4. Qin W, Chu B, Long L (2009) Analysis of construction monitoring of large-section box culvert jacking process underpass expressway. Chin J Rock Mech Eng 28(09):1790–1797
5. Wang X, Zhou F, Zhang Z, Guo J (2016) Dynamic deformation of the oversized cross-section rectangular pipe-jacking tunnel. Earth Sci 41(11):1959–1965