Author:
Tamannaei Mohammad,Saffarzadeh Mahmoud,Jamili Amin,Seyedabrishami Seyedehsan
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference27 articles.
1. Burdett RL, Kozan E (2009) Techniques for inserting additional trains into existing timetables. Transp Res Part B 43:821–836
2. Nagasaki Y, Eguchi M, Koseki T (2003) Automatic generation and evaluation of urban railway rescheduling plan. In: International symposium on speed-up and service technology for railway and maglev systems (STECH’03), Tokyo
3. Tanaka S (2009) Passenger flow analysis for train rescheduling and its evaluation. In: International symposium on speed-up, safety and service technology for railway and maglev systems (STECH’09), Niigata
4. Veelenturf LP (2012) Railway crew rescheduling with retiming. Transp Res Part C 20:95–110
5. Alwadood Z, Shuib A, Abd Hamid N (2013) Mathematical rescheduling models for railway services. World Academy of Science, Engineering and Technology, p 80
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献