1. Adams, J., Balas, E., Zawack, D.: The shifting bottleneck procedure for job-shop scheduling. Manag. Sci. 34(3), 391–401 (1988)
2. Adelsberger, H.H., Kanet, J.J.: The Leitstand—a new tool in computer-integrated manufacturing. Prod. Inventory Manag. J. 32(1), 43–48 (1991)
3. Agrawal, G.K., Heragu, S.S.: A survey of automated material handling systems in 300-mm semiconductor fabs. IEEE Trans. Semicond. Manuf. 19(1), 112–120 (2006)
4. Akali, E., Uzsoy, R.: A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography. In: Proceedings of the Twenty-Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp. 374–381 (2000)
5. Akali, E., Nemoto, K., Uzsoy, R.: Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semicond. Manuf. 14(1), 48–56 (2001)