Author:
Emmons Hamilton,Vairaktarakis George
Reference27 articles.
1. Abadi, I.N.K., N.G. Hall and C. Sriskandarajah (1997) Minimizing Cycle Time in a Blocking Flowshop, INFORMS working paper available at
2. http://opim.wharton.upenn.edu/˜harker/opsresearch.html
.
3. Abadi, I.N.K., N.G. Hall and C. Sriskandarajah (2000) Minimizing Cycle Time in a Blocking Flowshop, Operations Research, 48, 177–180.
4. Belkadi, K., M. Gourgand and M. Benyettou (2006) Resolution of Scheduling Problems of the Production Systems by Sequential and Parallel Tabu Search, Journal of Applied Sciences, 6, 1534–1539.
5. Caraffa, V., S. Ianes, T.P. Bagchi and C. Sriskandarajah (2001) Minimizing Makespan in a Blocking Flowshop Using Genetic Algorithms, International Journal of Production Economics, 70, 101–115.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献