Author:
Emmons Hamilton,Vairaktarakis George
Reference146 articles.
1. Adam, E. and R.J. Ebert (1992) Production & Operations Management, Fifth Edition. Prentice Hall, Englewood Cliffs, NJ.
2. Ahmadi, R.H. and U. Bagchi (1990) Improved Lower Bounds for Minimizing the Sum of Completion Times of n Jobs over m Machines in a Flow Shop, European Journal of Operational Research, 44, 331–336.
3. Aldowaisan, T. and A. Allahverdi (2003) New Heuristics for the No-wait Flowshops to Minimize Makespan, Computers and Operations Research, 30, 1219–1231.
4. Allahverdi, A. (2004) A New Heuristic for m-machine Flowshop Scheduling Problem with Bicriteria of Makespan and Maximum Tardiness, Computers and Operations Research, 31, 157–180.
5. Bagga, P.C. and N.K. Chakravarti (1968) Optimal m-Stage Production Schedule, Journal of the Canadian Operations Research Society, 6, 71–78.