1. Alchian, A. A. (1963), “Reliability of Progress Curves in Airframe Production,” Econometrica, VoL 31, pp. 679–693.
2. Balut, S. J. (1981), “Redistributing Fixed Overhead Costs,” Concepts, Vol. 4, No. 2, pp. 63–72.
3. Balut, S. J., T. R. Gulledge, Jr., and N. K. Womer (1989), “A Method of Repricing Aircraft Procurement,” Operations Research, Vol. 37, pp. 255–265.
4. Boger, D. C. and S. S. Liao (1988), Quantity-Split Strategy Under A Competitive Procurement Environment, NPS-54-88-008, Naval Postgraduate School, Monterey, CA.
5. Bohn, M. and L A. Kratz (1984), “The Impact of Production Rate on Unit Costs,” Paper presented at the ORSA/TIMS Joint National Meeting, San Francisco, CA.