1. Ammons, J.C., Govandaray, J. and Mitchell, C.M. (1986) Human Aided Scheduling for FMS: A paradigm for human-computer interaction in real time scheduling and control. Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, Elsevier Publishers BV, Amsterdam, pp. 443–54.
2. Arbel, A. and Seidman, A. (1984) Performance evaluation of flexible manufacturing systems. IEEE Transactions on Systems, Man, and Cybernetics, 14(4), 606–17.
3. Boer, H., Hill, M.R. and Krabbendam, J.J. (1990) FMS implementation management: promise and performance. International Journal of Operations and Production Management, 10(1), 5–20.
4. Bolwijn, P.T., Boorsma, J., van Breukelen, Q.H., Brinkman, S. and Kumpe, T. (1986) Flexible Manufacturing. Integrating Technological and Social Innovation. Elsevier, Amsterdam.
5. Buzacott, J. A. and Yao, D.D. (1986) Flexible manufacturing systems: a review of analytical models. Management Science, 32(7).