1. Al-Salamah, M., & Abudari, A. (2012). Production lot sizing & process targeting under process deterioration & machine breakdown conditions. Modeling and Simulation in Engineering, Hindawi Publishing Corporation, 7 pages doi:10.1155/2012/393495
2. Bazaraa, M. S., Sherali, H. D., & Shetty, C. M. (1993). Nonlinear programming: Theory and algorithms(2nd ed.). New York: Wiley.
3. Beyer, W. H. (1987). CRC handbook of mathematical sciences(6th ed.). Boca Raton: CRC Press.
4. Birge, J., Frenk, J. B. G., Mittenthal, J., & Rinnooy Kan, A. H. G. (1990). Single-machine scheduling subject to stochastic breakdowns. Naval Research Logistics, 37, 661–677.
5. Birge, J. R., & Glazebrook, K. D. (1988). Assessing the effects of machine breakdowns in stochastic scheduling. Operations Research Letters, 7(6), 267–271.