Author:
Hamidzadeh Babak,Atif Yacine,Ramamritham Krithi
Reference22 articles.
1. Bratley, P., Florian, M., and Robillard, P. 1971. Scheduling with earliest start and due date constraints. Naval Research Logistics Quarterly 18: 511-517.
2. Burns, A. 1991. Scheduling hard real-time systems: A review. Software Engineering Journal 6(3): 116-28.
3. Hamidzadeh, B., Shekhar, S., and Gopinath, P. 1993. A general search framework for dynamic scheduling of real-time tasks. IEEE Real-Time Operating Systems and Software Workshop.
4. Hamidzadeh, B., and Shekhar, S. 1993. Specification and analysis of real-time problem solvers. IEEE Transactions on Software Engineering 19(8).
5. Hong, K. S., and Leung, J. Y-T. 1988. On-line scheduling of real-time tasks. Proc. of the 9th IEEE Real-Time Systems Symposium, pp. 244-250