1. Gandhi, M. V. and Thompson, B. S. (1986) Automated design of modular fixtures for flexible manufacturing systems. J. Manuf. System, Vol. 5 No. 4, 243–252.
2. Hanada, T. (1995) Ph.D. Dissertation. Computer — supported set-up preparation and fixture free machining technologies for advanced automation of low-volume mechanical fabrication. Toyohashi University of Technology.
3. Hanada, T. and Hoshi, T. (1992) Block-Like component CAD/CAM system for fully automated CAM processing. Annals ofthe CIRP, 41/1, 551–556.
4. Hargrove, S. K. and Kusiak, A. (1994) Computer — aided fixture design: a review. International Journal of Production Research, 32, 4, 733–738.
5. Hayashi, A. and Yamazaki, K. and Hoshi, T. (1988) Development of fixture design and fabrication system by means of CAD/CAM. Proc. 16th NAMRC, 424-436.