Abstract
AbstractThe monitoring of an IRJ would allow targeted maintenance to be carried out, reducing the problems caused by its potential failures. The authors present the results of a test field investigation, that involved the installation of seven longitudinal displacement sensors that continuously record the gap value of insulated rail joints (IRJs). The monitoring of an IRJ would allow targeted maintenance to be carried out, reducing the problems caused by its potential failures. The studied monitoring system was installed in a station of the suburban railway line within the metropolitan city of Bologna (Italy). Analysis of low-and high-frequency recordings was performed. In particular, low-frequency acquisition was used to fit a statistical predictive model that detects a deviation from a standard behaviour and may evidence anomalies. For the high-frequency acquisitions (registered during train passage) some representative quantities, that can provide macroscopic indicators of loss of joint stiffness, were computed. Although gap measurement alone is not exhaustive for identifying all possible failure scenarios, the data acquired by these monitoring devices can represent a possible immediate monitoring solution, based on already available instrumentation, to provide user-friendly predictive analysis systems aiming at improving the railway maintenance.
Publisher
Springer Science and Business Media LLC
Subject
Electrical and Electronic Engineering,Urban Studies,Transportation,Automotive Engineering,Geography, Planning and Development,Civil and Structural Engineering
Reference18 articles.
1. Esveld C (2001) Modern railway track, 2nd Edn, MRT-Productions, The Netherlands
2. Kerr AD, Cox JE (1999) Analysis and tests of boned insulted rail joints subjected to vertical wheel loads. Int J Mech Sci 41:1253–1272. https://doi.org/10.1016/S0020-7403(98)00042-3
3. Wen Z, Tin X, Zhang W (2005) Contact-impact stress analysis of rail joint region using the dynamic finite element method. Wear 258:1301–1309. https://doi.org/10.1016/j.wear.2004.03.040
4. RFI (2014) Procedura operativa subdirezionale RFI DPR PS IFS 118 B, Fabbricazione e gestione GII, Rete Ferroviaria Italiana, Roma
5. Davis DD, Akhtar MN, Kohake E, Horiszny K (2005) Effects of heavy axle loads on bonded insulated joint performance. In: Proceedings of the AREMA Annual Conference. Chicago, IL
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献