1. He L (2018) Application of hazard identification and assessment grading optimization method for metro lines. Safety 39(8):8–11
2. Yang NH, Ye M, Wu AM (2017) Hazard identification and risk assessment for safe operation of modern tram. Modern Transp Technol 14(2):75–80
3. Yang QM (2018) Research on safety risk identification and analysis of large railway passenger station system [D]. Beijing Jiaotong University, Beijing
4. Wang J (2010) Research on building construction safety prediction based on RS-GA-BP. J Eng Manag 24(6):647–651
5. Jia RY, Pan WW (2012) Partner selection of virtual enterprise based on rough set and genetic algorithm. J Harbin Eng Univ. 33(6):730–734