1. J. L. Perry, J. L. Kirkhart andD. F. Adams, Final Report, Naval Air Systems Command, Contract N00019-73-C-0389, Aeronutronic Division, Philco-Ford Corporation, March 1974.
2. J. L. Perry andD. F. Adams,Composites 6 (1975) 166.
3. J. L. Perry, D. F. Adams andA. K. Miller, Final Report, Naval Air Systems Command, Contract N00019-74-C-0229, Aeronutronic Division, Philco-Ford Corporation, January 1975.
4. D. F. Adams andJ. L. Perry,J. Testing and Evaluation,5 (2) (1977).
5. D. F. Adams andA. K. Miller,Mat. Sci. Eng. 19 (1975) 245.