1. Aki K 1965 Maximum likelihood estimate of b in the formula log N = a − bM and its confidence limits; Bull. Earthq. Res. Inst. 43 237–239.
2. Aki K 1981 A probabilistic synthesis of precursory phenomena; In: Earthquake prediction: An international review; (eds) Simpson D W and Richards P G, AGU, Washington, DC, pp. 566–574.
3. Arora B R, Rawat G and Singh A K 2002 Mid crustal conductor below the Kutch rift basin and its sesimogeinc relevance to the 2001 Bhuj earthquake; DC-DST News Govt. of India, New Delhi, India, pp. 22–24.
4. Bender B 1983 Maximum likelihood estimation of b-values for magnitude grouped data; Bull. Seismol. Soc. Am. 73 831–851.
5. Chandrasekhar D V and Mishra D C 2002 Some geodynamic aspects of Kachchh basin and seismicity: An insight from gravity studies; Curr. Sci. 83 492–498.