1. Saasen A, Simpson M, Ribesen B, Høj J (2010) Anchor handling and rig move for short weather windows during exploration drilling. In: The IADC/SPE drilling conference and exhibition, New Orleans
2. Lyng I (2008) Official norwegian reports: the loss of the “bourbon dolphin” on 12 April 2007. In: Technical report NOU 2008, vol 8. Royal Norwegian Ministry of Justice and the Police
3. Nielsen LG (2004) Casualty report: Stevns power capsizing and foundering during anchor handling operation on 19 October 2003. In: Technical report 199940518, Danish Maritime Authority
4. Gunnu GRS, Moan T (2012) Stability assessment of anchor handling vessel during operation considering wind loads and wave induced roll motions. In: The 22nd international offshore and polar engineering conference. ISOPE, Rhodes
5. Hukkelås T (2012) How to increase the safety during anchor handling operations?. Technical report, Kongsberg Maritime AS, Kongsberg