1. TES ENERGYFACADE: TES EnergyFaçade–prefabricated timber based building system for improving the energy efficiency of the building envelope, Period from 01/2008 to 12/2009, funded by BMBF, represented by PTJ,
http://www.tesenergyfacade.com
2. Larsen, K.E., Lattke, F., Ott, S., Winter, S.: Surveying and digital workflow in energy performance retrofit projects using prefabricated elements. Automation in Construction 20(8), 999–1011 (2011), doi:10.1016/j.autcon.2011.04.001
3. Davidson, C.H.: The challenge of organizational design for manufactured construction. Construction Innovation. Information, Process, Management 9(1), 42–57 (2009), doi: 10.1108/147141709109315342009
4. Jensen, P., Olofsson, T., Johnsson, H.: Configuration through the parameterization of building components. Automation in Construction 23, 1–8 (2012), doi:10.1016/j.autcon.2011.11.016
5. Ott, S., Loebus, S., Winter, S.: Vorgefertigte Holzfassadenelemente in der energetischen Modernisierung. Bautechnik 90(1), 26–33 (2013), doi:10.1002/ bate.201330024