Author:
Ouarda Taha B. M. J.,Ashkar Fahim
Reference85 articles.
1. Ambrosino, G., G. Fronza and G. Guariso, “Real-Time Predictor Versus Synthetic Hydrology for Sequential Reservoir Management”, Water Resources Research, Vol. 15, No. 4, Pages 885–890, 1979
2. Araujo, A.R., and L.A. Terry, “Operation of a Hydrothermal System”, Braz. J. Electr. Energy, 1974
3. Arunkumar, S. and W.W-G. Yeh, Probabilistic Models in the Design and Operation of a Multipurpose Reservoir System, Contrib. 144, Calif. Water Resour. Cent., University of California, Davis, December, 1973
4. Askew, A.J., “Optimum Reservoir Operating Policies and the Imposition of a Reliability Constraint”, Water Resources Research, Vol. 10, No. 1, Pages 51–56, February, 1974a
5. Askew, A.J., “Chance-Constrained Dynamic Programming and the Optimization of Water Resources Systems”, Water Resources Research, Vol. 10, No. 6, Pages 1099–1106, December, 1974b