1. N.R. Achuthan (1980) Flow-Shop Scheduling Problems, Ph.D. Thesis, Indian Statistical Institute, Calcutta.
2. I. Adiri, N. Hefetz (1980) Subproblems of openshop — more than two machines — schedule length problem. Operations Research, Statistics and Economics Mimeograph Series 260, Technion, Haifa.
3. D. Adolphson (1977) Single machine job sequencing with precedence constraints. SIAM J. Comput. 6, 40–54.
4. D. Adolphson, T.C. Hu (1973) Optimal linear ordering. SIAM J. Appl. Math. 25, 403–423.
5. K.R. Baker (1974) Introduction to Sequencing and Scheduling, Wiley, New York.