Author:
Leon V. Jorge,Wu S. David
Reference27 articles.
1. Askin, R.G. and Standridge, C.R. (1993) Modelling and Analysis of Manufacturing Systems, John Wiley and Sons Inc.
2. Baker, K. (1974) Introduction to Sequencing and Scheduling, Wiley.
3. Bean, J.C., Birge, J.R., Mittenthal, J. and Noon, C. (1991) Match-up Scheduling with Multiple Resources. Operations Research, 39, pp. 470–83.
4. Boctor, F.F. (1990) Some Efficient Multi-heuristic Procedures for Resource-Constrained Project Scheduling. European Journal of Operational Research, 49, pp. 3–13.
5. Buzacott, J.A. and Yao, D.D. (1986) Flexible Manufacturing Systems: A Review of Analytical Models. Management Science, 32(7), pp. 890–905.